Factory Cheap Hot Best Exhaust Fan For Large Bathroom - 24Ft Cool Gym Fans – OPTFAN
Factory Cheap Hot Best Exhaust Fan For Large Bathroom - 24Ft Cool Gym Fans – OPTFAN Detail:
Here are examples on how to cut costs with OPT HVLS Fans installed in gym room:
1.Operating on its own: HVLS fans replace the stale air and increase evaporation from skin. Perceived temperatures are 7–10 degrees lower. Productivity rises. No need to cut operating hours during heat waves.
2.Operating with heating: Using heating less thanks to destratification, which means less noise from operating heating units and up to 20 percent savings on heating costs.
3.Operating with HVAC: Thermostat of the air-conditioning unit can be set 5–7°C warmer without noticed difference. HVAC system can be operating for fewer hours, which allows saving up to 30 percent on cooling costs.
Specification of cool gym fans
Diameter(M) | 7.3 | 6.1 | 5.5 | 4.9 |
Model | OM-PMSM-24 | OM-PMSM-20 | OM-PMSM-18 | OM-PMSM-16 |
Voltage(V) | 220V 1P | 220V 1P | 220V 1P | 220V 1P |
Current(A) | 4.69 | 3.27 | 4.1 | 3.6 |
Speed Range(RPM) | 10-55 | 10-60 | 10-65 | 10-75 |
Power(KW) | 1.5 | 1.1 | 0.9 | 0.8 |
Air Volume(CMM) | 15,000 | 13,200 | 12,500 | 11,800 |
Weight(KG) | 121 | 115 | 112 | 109 |
Details
Applications
Hot Tags: cool gym fans, China, manufacturers, factory, price, for sale
Product detail pictures:

Related Product Guide:
WORKSHOP
We are convinced that with joint endeavours, the small business between us will bring us mutual benefits. We could assure you products quality and competitive selling price for Factory Cheap Hot Best Exhaust Fan For Large Bathroom - 24Ft Cool Gym Fans – OPTFAN , The product will supply to all over the world, such as: Durban, Denver, Guinea, We are seeking the chances to meet all the friends from both at home and abroad for the win-win cooperation. We sincerely hope to have long-term cooperation with all of you on the bases of mutual benefit and common development.

This company can be well to meet our needs on product quantity and delivery time, so we always choose them when we have procurement requirements.
